MK2 Robotics
Raising a pre-seed round
Deployment infrastructure for vertical AI robotics.
Labs make robots generally capable; we make them useful on the job, on top of any foundation model. EGO takes a robot and a job in a real cell to a verified deployment, and the Dex Hand carries the jobs a gripper cannot. We are raising a pre-seed round.
01 — The opportunity
4.66 million robots are installed. Each one still needs a programmer.
Arms move precisely and vision sees well, at scale. What multiplies them is a robot taught a new task in days, not months, and a hand that can do it.
Assembly, kitting and machine tending are still done by hand at most plants. We build both pieces: the system that deploys a robot onto the job, and a hand dexterous enough to do it.
02 — Market
The market is already installed, and growing.
Every one of those robots needs its tasks taught. EGO works with the grippers already in service; the Dex Hand takes the jobs they cannot.
Source: IFR World Robotics 2025 · Market for robot grippers and hands $5.54B (2025) → $10.58B (2030), Mordor Intelligence
03 — Roadmap
Data first. Then deployment. Then hardware.
Data → Deployment → Hardware
Software
-
Ready now
Phase 1 — Verified skills and data
Pick-and-place at 95%+ on two grippers, peg insertion at 98%, gear meshing ahead of NVIDIA’s Factory baseline. 50 verified skills and their data by January.
-
Critical next step
Phase 2 — Deployment in real cells
One real cell first, then a design partner, with real success rates next to the simulated ones.
Pilot partners go first. Bring a gripper, an arm and a real task, and send a pre-order request.
-
As soon as Phase 2 proves it
Phase 3 — EGO, licensed to companies
Automation teams deploy with EGO on their own robots and jobs, on top of any foundation model they choose. Every deployment makes the next one cheaper.
Hardware
-
Complete
Phase 1 — Mechanism
3D-printed and servo-driven. Proved how the fingers move.
-
Finalizing design
Phase 2 — Software test platform
Aluminum frame, linear actuators, custom controller, full sensors. Finalizing with suppliers and machine shops.
-
Next
Phase 3 — Production
The hand that ships, built for volume from day one.
We are raising a pre-seed round.It takes EGO into real cells and Phase 2 hands onto production lines.
Investor inquiry →Follow the build.Results and lessons, on the blog.
Read the blog →04 — Team
The founders.
Kameron Jones
Co-Founder
Lead Engineer — mechanism, tolerancing, manufacturing
Milo Kucia
Co-Founder
Software Lead — reinforcement learning, control, firmware
05 — Contact
Start a conversation.
Investors, systems integrators and automation teams: if you have a robot cell and a task, we want to hear from you.